Loading...
HomeMy WebLinkAboutIntermountain Gas 220303 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 3-Mar-22 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 0.5 Standard:F__1 Construction: 0.5 Training: F__] (T)(D) Integrity Management: E] Incident: M/W = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 3 Mar 2022 (0.5) construction,typed reports Observed a Das-co crews installing new W PE service lines at 473/487 Screechowl Drive, Kuna Idaho Observed line locating, excavation, service line building, pressure testing, shading and riser install.All procedures were followed. Attachments: IPUC Form 4 Construction Inspection Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): / ,., Date: Bruce Perkins L�� _ 3-Mar-22 Reviewer: fil Date: Jeff Brooks IPUC Form 1