HomeMy WebLinkAboutIntermountain Gas 220303 Kuna Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins I Date(s): 3-Mar-22
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 0.5
Standard:F__1 Construction: 0.5 Training: F__] (T)(D) Integrity Management: E] Incident:
M/W = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company
3 Mar 2022 (0.5) construction,typed reports
Observed a Das-co crews installing new W PE service lines at 473/487 Screechowl Drive, Kuna Idaho Observed
line locating, excavation, service line building, pressure testing, shading and riser install.All procedures were
followed.
Attachments:
IPUC Form 4 Construction Inspection
Das-co Utilities daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): / ,., Date:
Bruce Perkins L�� _ 3-Mar-22
Reviewer: fil Date:
Jeff Brooks