Loading...
HomeMy WebLinkAboutIntermountain Gas 220214 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 14-Feb-22 Company/Owner: Intermountain Gas Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 1 Standard:F1 Construction: FTI Training: F__] (T)(D) Integrity Management: D Incident: M/M: F-1 Follow-up: F1 OQ: F-1 Damage Prevention: El D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 14 Feb 2022 (1.0) construction, typed reports Observed a Das-co crews installing new W PE service line, observed line locating, excavation, boring, service line building, shading, riser install, pressure testing and purging at 14587 Woosley Dr, Nampa ID. All procedures were followed. Attachments: IPUC Form 4 Construction Inspection Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector (Lead): Date: Bruce Perkins f �— 14-Feb-22 Reviewer: Date: Jeff Brooks IPUC Form 1