HomeMy WebLinkAboutIntermountain Gas 220214 Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 14-Feb-22
Company/Owner: Intermountain Gas Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 1
Standard:F1 Construction: FTI Training: F__] (T)(D) Integrity Management: D Incident:
M/M: F-1 Follow-up: F1 OQ: F-1 Damage Prevention: El D&A:
Inspection Summary
A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company
14 Feb 2022 (1.0) construction, typed reports
Observed a Das-co crews installing new W PE service line, observed line locating, excavation, boring, service
line building, shading, riser install, pressure testing and purging at 14587 Woosley Dr, Nampa ID. All procedures
were followed.
Attachments:
IPUC Form 4 Construction Inspection
Das-co Utilities daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (Lead): Date:
Bruce Perkins f �— 14-Feb-22
Reviewer: Date:
Jeff Brooks
IPUC Form 1