Inspector(s): Perkins Date(s): 10-Feb-22
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 1
Standard:F—] Construction: FI Training: F—] (T)(D)Integrity Management: El Incident: EJ
M/M: F-1 Follow-up: F7 OQ: F-1 Damage Prevention: El D&A:
Inspection Summary
A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company
10 Feb 2022 (1.0) construction, typed reports
Observed a Das-co crews installing new%" PE service line, observed line locating, excavation, service line
building, shading, riser install, pressure testing and purging at 5144 W Grand Rapids Rd, Meridian ID. All
procedures were followed.
Attachments:
IPUC Form 4 Construction Inspection
Das-co Utilities daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (lead): '' Date:
10-Feb-22
Bruce Perkins %; % = �
1�
Reviewer: Date:
Jeff Brooks 11-0