Loading...
HomeMy WebLinkAboutIntermountain Gas 220210 Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 10-Feb-22 Company/Owner: Intermountain Gas Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 1 Standard:F—] Construction: FI Training: F—] (T)(D)Integrity Management: El Incident: EJ M/M: F-1 Follow-up: F7 OQ: F-1 Damage Prevention: El D&A: Inspection Summary A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company 10 Feb 2022 (1.0) construction, typed reports Observed a Das-co crews installing new%" PE service line, observed line locating, excavation, service line building, shading, riser install, pressure testing and purging at 5144 W Grand Rapids Rd, Meridian ID. All procedures were followed. Attachments: IPUC Form 4 Construction Inspection Das-co Utilities daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (lead): '' Date: 10-Feb-22 Bruce Perkins %; % = � 1� Reviewer: Date: Jeff Brooks 11-0 IPUC Form 1