HomeMy WebLinkAboutIntermountain Gas 220209 Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 9-Feb-22
Company/Owner: Intermountain Gas Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days:1 1
Standard: Construction: Training: (T)(D)Integrity Management: Incident:
M/M: Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co Utilities, a contractor for Intermountain Gas Company
9 Feb 2022 (1.0) construction, typed reports
Observed a Das-co crews installing new%" PE service line, observed line locating, excavation, service line
building, shading and riser install, ground was so frozen they had to use jackhammers to break up the ground,
so remainder of installation was delayed at 1085 W Loretta St, Meridian ID. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspection
Das-co Utilities daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (Lead): Date:
Bruce Perkins 9-Feb-22
Reviewer: Date:
Jeff Brooks
IPUC Form 1