Loading...
HomeMy WebLinkAboutIntermountain Gas 220126 Twin Falls Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks I Date(s): 26-Jan-22 Company/Owner: I IGC/Track Utilities Unit/OPID: 18160 Inspection Type &Time (I day, 0.5 day) Total Inspection Days:12 Standard:F-1 Construction:F2 Training: F__] (T)(D) Integrity Management: El Incident: E] Gas Rule: F-1 Follow-up: F-1 oct: F-1 Damage Prevention: E] D&A: F7 Inspection Summary A construction inspection was performed on Track Utilities, a contractor for Intermountain Gas Company 26 Jan 2022 (2.0) construction and travel back to Boise) Observed a Track Utilities crew cutting out a PE 3/4"bolt on tee off a 2" line,then fusing 2"pipe in its place at Rock Creek Point subdivision in Twin Falls,Idaho. All procedures were followed. Attachments IPUC Form 4 Construction Inspection Daily itinerary located in file for the project OQ's for all observed employees are located in file for the project Pictures of job tickets/dig tickets Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: Perkins C' 26-Jan-22 Reviewer: Date: Brooks VJL� 11-�4-"_ IPUC Form 1