HomeMy WebLinkAboutIntermountain Gas 220126 Twin Falls Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Brooks I Date(s): 26-Jan-22
Company/Owner: I IGC/Track Utilities Unit/OPID: 18160
Inspection Type &Time (I day, 0.5 day) Total Inspection Days:12
Standard:F-1 Construction:F2 Training: F__] (T)(D) Integrity Management: El Incident: E]
Gas Rule: F-1 Follow-up: F-1 oct: F-1 Damage Prevention: E] D&A: F7
Inspection Summary
A construction inspection was performed on Track Utilities, a contractor for Intermountain Gas Company
26 Jan 2022 (2.0) construction and travel back to Boise)
Observed a Track Utilities crew cutting out a PE 3/4"bolt on tee off a 2" line,then fusing 2"pipe in its place at
Rock Creek Point subdivision in Twin Falls,Idaho. All procedures were followed.
Attachments
IPUC Form 4 Construction Inspection
Daily itinerary located in file for the project
OQ's for all observed employees are located in file for the project
Pictures of job tickets/dig tickets
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): Date:
Perkins C' 26-Jan-22
Reviewer: Date:
Brooks VJL� 11-�4-"_
IPUC Form 1