HomeMy WebLinkAboutIntermountain Gas 220125 Twin Falls Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Brooks Date(s): 25-Jan-22
Company/Owner: IGC/KV Utilities Unit/OPID: 18160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2
Standard:FI Construction:72 Training: F7 (T)(D) Integrity Management: Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on KV Utilities, a contractor for Intermountain Gas Company
25 Jan 2022 (2.0) construction)
Observed KV Utilities crews installing 3/4" service lines at 730/740 Shadowleaf Ave and 717 Twilight Loop in
Twin Falls,Idaho. Crews performed locating, excavating,pipe joining,pressure testing, meter bar installation
and backfilling. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspection
Daily itinerary located in file for the project
OQ's for all observed employees are located in file for the project
Pictures of job tickets/dig tickets
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector(Lead): Date:
Perkins 25-Jan-22
Reviewer: Date:
Brooks /.
IPUC Form 1