Loading...
HomeMy WebLinkAboutIntermountain Gas 220125 Twin Falls Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): 25-Jan-22 Company/Owner: IGC/KV Utilities Unit/OPID: 18160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard:FI Construction:72 Training: F7 (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on KV Utilities, a contractor for Intermountain Gas Company 25 Jan 2022 (2.0) construction) Observed KV Utilities crews installing 3/4" service lines at 730/740 Shadowleaf Ave and 717 Twilight Loop in Twin Falls,Idaho. Crews performed locating, excavating,pipe joining,pressure testing, meter bar installation and backfilling. All procedures were followed. Attachments: IPUC Form 4 Construction Inspection Daily itinerary located in file for the project OQ's for all observed employees are located in file for the project Pictures of job tickets/dig tickets Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead): Date: Perkins 25-Jan-22 Reviewer: Date: Brooks /. IPUC Form 1