HomeMy WebLinkAboutIntermountain Gas 220124 Twin Falls NEO Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Brooks I Date(s): 24-Jan-22
Company/Owner: IGC/Das-Co Unit/OPID: 18160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2
Standard:F] Construction:F72 Training: F—] (T)(D) Integrity Management: EJ Incident:
Gas Rule: F] Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company
24 Jan 2022(2.0)travel/construction)
Observed a Das-co crew trenching, locating and fusing 4" fittings for a future reg station at the Williams tap off
2800 Rd in Twin Falls, Idaho. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspection
Daily itinerary located in file for the project
OQ's for all observed employees are located in file for the project
Pictures of job tickets/dig tickets
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): - ' Date:
Perkins „�/ 24-Jan-22
Reviewer: Date:
Brooks �/-
IPUC Form 1