Loading...
HomeMy WebLinkAboutIntermountain Gas 220124 Twin Falls NEO Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks I Date(s): 24-Jan-22 Company/Owner: IGC/Das-Co Unit/OPID: 18160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard:F] Construction:F72 Training: F—] (T)(D) Integrity Management: EJ Incident: Gas Rule: F] Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company 24 Jan 2022(2.0)travel/construction) Observed a Das-co crew trenching, locating and fusing 4" fittings for a future reg station at the Williams tap off 2800 Rd in Twin Falls, Idaho. All procedures were followed. Attachments: IPUC Form 4 Construction Inspection Daily itinerary located in file for the project OQ's for all observed employees are located in file for the project Pictures of job tickets/dig tickets Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): - ' Date: Perkins „�/ 24-Jan-22 Reviewer: Date: Brooks �/- IPUC Form 1