Loading...
HomeMy WebLinkAboutIntermountain Gas 220120 Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): JPerkins Date(s): 20-Jan-22 Company/Owner: IGC/Das-Co Unit/OPID: 18160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1 Standard: Construction: Training: (T)(D) Integrity Management: = Incident: Gas Rule: Follow-up: OQ: Damage Prevention: El D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company 20 Jan 2022 (1.0) construction) Observed a Das-co crew line locating, potholing, excavating, boring and installing a 3/4"service line at 710 S Owyhee St in Boise, Idaho. All procedures were followed. Attachments: IPUC Form 4 Construction Inspection Daily itinerary located in file for the project OQ's for all observed employees are located in file for the project Pictures of job tickets/dig tickets Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): _ f Date: Perkins 20-Jan-22 Reviewer: Date: Brooks I I- IPUC Form 1