HomeMy WebLinkAboutIntermountain Gas 220120 Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): JPerkins Date(s): 20-Jan-22
Company/Owner: IGC/Das-Co Unit/OPID: 18160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1
Standard: Construction: Training: (T)(D) Integrity Management: = Incident:
Gas Rule: Follow-up: OQ: Damage Prevention: El D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company
20 Jan 2022 (1.0) construction)
Observed a Das-co crew line locating, potholing, excavating, boring and installing a 3/4"service line at 710 S
Owyhee St in Boise, Idaho. All procedures were followed.
Attachments:
IPUC Form 4 Construction Inspection
Daily itinerary located in file for the project
OQ's for all observed employees are located in file for the project
Pictures of job tickets/dig tickets
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead): _ f Date:
Perkins 20-Jan-22
Reviewer: Date:
Brooks I I-
IPUC Form 1