HomeMy WebLinkAboutIntermountain Gas 220119 Emmett Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): JPerkins I Date(s): 19-Jan-22
Company/Owner: IGC/Das-Co Unit/OPID: 18160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1
Standard: Construction:Fi_� Training: (T)(D) Integrity Management: Incident:
Gas Rule: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspecton was performed on Das-co, a contractor for Intermountain Gas Company
19 Jan 2022 (1.0) construction)
Observed a Das-co crew installing a 3/4" service line at 311 S Fuji Ave in Emmett, Idaho. All procedures were
followed.
Attachments:
1PUC Form 4 Contruction Inspection
Daily inenerary located in file for the project
OQ's for all observed employees are located in file for the project
Pictures of job tickets/dig tickets
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector(Lead): �y Date:
Perkins 19-Jan-22
Reviewer: Date:
Brooks
IPUC Form 1