Loading...
HomeMy WebLinkAboutIntermountain Gas 220118 Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 18-Jan-22 Company/Owner: IGC/Das-Co Unit/OPID: 18160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:11 Standard:F-] Construction:FI Training: F__] (T)(D) Integrity Management: F-1 Incident: E] Gas Rule: F] Follow-up: 7] Oct: Damage Prevention: D&A: Inspection Summary A construction inspecton was performed on Das-co, a contractor for Intermountain Gas Company 18 Jan 2022 (1.0)construction) Observed a Das-co crews installing 3/4" service line at 1267 W Chinden Blvd in Meridian,Idaho. Before excavating the Das-co foreman asked the General Contractor if there was anything not marked or in the way before digging and was told no. While excavating the backhoe operator struck a new 12" water main which had not been put into service yet. Dasco supervisor upon seeing the line break, followed Idaho dig line laws and contacted the owner of the water line and provided support to repair the line. While excavating to install the new service line, it was discovered that when the 2" main was put in that it was not deep enough and Das-Co foreman contacted IGC FOC for guidance, FOC instructed Das-Co to dig the main deeper and then finished install . All procedures were followed. Attachments: IPUC Form 4 Contruction Inspection Daily inenerary located in file for the project OQ's for all observed employees are located in file for the project Pictures of job tickets/dig tickets Corrective Action Required: Yes No X Follow-up Required: by (date):. Yes No X Inspector (Lead): ,f Date: Perkins 18-Jan-22 Reviewer: Date: Brooks ff IPUC Form 1