Loading...
HomeMy WebLinkAboutIntermountain Gas 221201 HPSS Garden City Idaho PUC Pipeline Safety Inspection Summary Inspector(s): 113rooks, Galli I Date(s): 12/1/2022 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: HPSS/08160 Inspection Type &Time (1 day, 0.5 day) ITotal Inspection Days: 1 Standard: Construction: Training: =(T)(D) Integrity Management: Incident: M/M: =Follow-up: =OQ: =Damage Prevention: D&A: Inspection Summary December 1, 2022: (1 Standard) A field inspection was performed on a High Pressure Service Sets (HPSS) in the Boise District by the Idaho Public Utilities Commission at 6000 B Glenwood St, Garden City.This HPSS was inspected for pipe to soil interface, cathodic protection, atmospheric corrosion, regulator vent screens, leaks, excessive vegetation and protection from outside force damages. No hazardous conditions or code violations were discovered. IPUC inspectors inspected meter set#227661 in a mobile home park at 406 E 44th St#31, Garden City, ID. There was a slight leak from the inlet side riser fittings. IGCs leak line was contacted and a service tech was to respond per IGC Field activity#78000451188. IPUC inspectors witnessed Mallard Pointe apartment complex located at 508 E 50th St,Garden City, ID with only one or two meters which was possibly an indication of a master meter. Verified by phone with the apartment complex management that they use the gas to fuel water heaters throughout the buildings and do not charge tennants for gas usage. IPUC Pipeline Inspectors were provided a photo of meter 526625 at the Pocatello Railroad yard (275 S Harrison Ave, Pocatello, ID 83204).The photo appeared to show the meter was resting on a concrete slab and had possible erosion issues which buried the inlet valve. IGC personell were to investigate and perform corrective actions as neccessary. Attachments: IPUC Form 1, Inspection Summary IPUC HPSS Status Work Sheets Email chain saved to file for meter 526625 Fix Boise meter leak per field activity #78000451188. Mitigate issues at meter 526625 Corrective Action Required: in Pocatello district per email chain (on file). Yes X No Follow-up Required: by(date): Yes No X Inspector (Lead): Date: 12/1/2022 Brooks Reviewer: Date: IPUC Form 1