Loading...
HomeMy WebLinkAboutIntermountain Gas 221129-30 Rexburg Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks I Date(s): 29-30 Nov 22 Company/Owner: Intermountain Gas Company Unit/OPID: I LNG/8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 3 Standard:F73 Construction: 71 Training: F7 (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Nov 29,2022: (1.0 Standard Travel) Traveled to Rexburg Nov 30,2022: (1.0 Standard Travel) Observed Rexburg LNG plant vaporization and training activities at the Rexburg LNG Facility to test equipment and vaporize approximately 3,555 gallons of LNG. A 24 deg day was used when creating this plan and all estimated pressures and times may vary according to actual LV customer usage and ambient temperatures at the time of operation. 22 degrees when we arrived on site so plan was adjusted. Nov 30,2022: (1.0 Standard Travel/typed reports) Traveled from Rexburg Attached: IPUC Form 1, Inspection Summary RNG LNG Test Vaporization Work Plan Corrective Action Required: Yes No / I P A Follow-up Required: by(date : No Inspector (Lead): Date: Perkins 30-Nov-22 Reviewer: Date: Brooks IPUC Form 1