Loading...
HomeMy WebLinkAboutIntermountain Gas 220812 Section 114 Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks, Galli Date(s): 8/12/2022 Company/Owner: Intermountain Gas Company Unit/OPID: 816o Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 0.5 Standard: 0.5 Construction: Training: (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Joint audit consisted of Dennis Ritter of Washington PUC inspecting Cascade Natural Gas for compliance with Section 114 criteria. Intermountain Gas Company (IGC)and Cascade are a part of Montana Dakota Utilities and all companies use the same procedures. IPUC is accepting the results of this inspection and agreed with findings/concerns, based upon IGC's answers to question sets. Attached: IA Exit Interview Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector (Lead): Date: Perkins 8/12/2022 Reviewer: Date: Brooks 8/12/2022 tit IPUC Form 1