HomeMy WebLinkAboutIntermountain Gas 220812 Section 114 Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins, Brooks, Galli Date(s): 8/12/2022
Company/Owner: Intermountain Gas Company Unit/OPID: 816o
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 0.5
Standard: 0.5 Construction: Training: (T)(D) Integrity Management: Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
Joint audit consisted of Dennis Ritter of Washington PUC inspecting Cascade Natural Gas for compliance with
Section 114 criteria. Intermountain Gas Company (IGC)and Cascade are a part of Montana Dakota Utilities
and all companies use the same procedures. IPUC is accepting the results of this inspection and agreed with
findings/concerns, based upon IGC's answers to question sets.
Attached:
IA Exit Interview
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (Lead): Date:
Perkins 8/12/2022
Reviewer: Date:
Brooks 8/12/2022
tit
IPUC Form 1