Loading...
HomeMy WebLinkAboutIntermountain Gas 220801-02 Idaho Falls Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins I Date(s): 1-2 August 2022 Company/Owner: Intermountain Gas Company Unit/OPID: I Idaho Falls Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 3 Standard: 2.5 ConstructionT-1 Training: = (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: 0.5 Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting field installed equipment and operator qualification for the Idaho Falls, Idaho inspection unit. Records and procedures for all Idaho Intermountain Gas Units were inspected in March 2022 at the Intermountain Gas Company (IGC) headquarters in Boise, Idaho. January 19, 2022: (0.5 Standard Prep) Prepared for IGC Idaho Falls Field Audit August 1-2, 2022: (1.5 Standard, .5 OQ) Traveled to Idaho Falls and met with IGC company representatives in the Idaho Falls district office for in-brief, JSA and to begin field audit. Regulator Stations: 48759-RS-60781, 48759-RS-60779,48759-RS-60785,48759-RS-60786,48759-RS-60791, 48759-RS-60777, 48759-RS-60792, 48759-RS-59870, 48759-RS-59804,48759-RS-60789, 48759-RS-60793, 48759-RS-60773, 48759-RS-60333,48741-RS-59680,48741-RS-59856 and 48729-RS-60851 were inspected for proper operating parameters, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings, pipe-to soil interface wrap protection, station warning signs and right-of-way clearances. One odorizer reading on regulator station 48759-RS-60793, eleven casing-to-carrier isolation checks,three cathodic protection rectifiers, seven pipeline patrols, and sixteen emergency isolation valves were checked for proper operation. An IPUC Form 3 (exit interview) was performed following the district inspection with Will Lindsey(Pipeline Safety Specialist) and Teri Tengaio (Idaho Falls District Manager) of Intermountain Gas Company. Observations: Reg Stations:48759-RS-60773 primary failed lock-up due to debris on diaghragm 48759-RS-60792 and 48759-RS-60793, not plumbed for lock-up testing August 4, 2022: (.5) Standard) Traveled back to Boise,completed forms and typed report IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Field Equipment Status Worksheets PHMSA Form 15 OQ Field Pictures of calibration certificates Corrective Action Required: Yes Na X Follow-up Required: �J by(da ): Yes No X Inspector(Lead): ,�✓�"" Date: Perkins 4-Aug-22 Reviewer: Date: Brooks IPUC Form 1