HomeMy WebLinkAboutIntermountain Gas 220801-02 Idaho Falls Field Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins I Date(s): 1-2 August 2022
Company/Owner: Intermountain Gas Company Unit/OPID: I Idaho Falls
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 3
Standard: 2.5 ConstructionT-1 Training: = (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: 0.5 Damage Prevention: D&A:
Inspection Summary
Audit consisted of inspecting field installed equipment and operator qualification for the Idaho Falls, Idaho
inspection unit. Records and procedures for all Idaho Intermountain Gas Units were inspected in March 2022 at
the Intermountain Gas Company (IGC) headquarters in Boise, Idaho.
January 19, 2022: (0.5 Standard Prep)
Prepared for IGC Idaho Falls Field Audit
August 1-2, 2022: (1.5 Standard, .5 OQ)
Traveled to Idaho Falls and met with IGC company representatives in the Idaho Falls district office for in-brief,
JSA and to begin field audit.
Regulator Stations: 48759-RS-60781, 48759-RS-60779,48759-RS-60785,48759-RS-60786,48759-RS-60791,
48759-RS-60777, 48759-RS-60792, 48759-RS-59870, 48759-RS-59804,48759-RS-60789, 48759-RS-60793,
48759-RS-60773, 48759-RS-60333,48741-RS-59680,48741-RS-59856 and 48729-RS-60851 were inspected for
proper operating parameters, regulator lock-up, relief device operation, cathodic protection pipe-to-soil
readings, pipe-to soil interface wrap protection, station warning signs and right-of-way clearances.
One odorizer reading on regulator station 48759-RS-60793, eleven casing-to-carrier isolation checks,three
cathodic protection rectifiers, seven pipeline patrols, and sixteen emergency isolation valves were checked for
proper operation.
An IPUC Form 3 (exit interview) was performed following the district inspection with Will Lindsey(Pipeline
Safety Specialist) and Teri Tengaio (Idaho Falls District Manager) of Intermountain Gas Company.
Observations:
Reg Stations:48759-RS-60773 primary failed lock-up due to debris on diaghragm
48759-RS-60792 and 48759-RS-60793, not plumbed for lock-up testing
August 4, 2022: (.5) Standard)
Traveled back to Boise,completed forms and typed report
IPUC Form 1
Idaho PUC Pipeline Safety Inspection Summary
Attached:
IPUC Form 1, Inspection Summary
IPUC Form 3, Exit Interview
IPUC Field Equipment Status Worksheets
PHMSA Form 15 OQ Field
Pictures of calibration certificates
Corrective Action Required: Yes Na X
Follow-up Required: �J by(da ): Yes No X
Inspector(Lead): ,�✓�"" Date:
Perkins 4-Aug-22
Reviewer: Date:
Brooks
IPUC Form 1