Loading...
HomeMy WebLinkAboutIntermountain Gas 220516-19 Nampa LNG Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Brooks/Galli Date(s): 16-19 May 22 Company/Owner: Intermountain Gas Company Unit/OPID: LNG/8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 10.5 Standard: 105 Construction:F1 Training: F__] (T)(D) Integrity Management: E] Incident: M/M: 71 Follow-up: F-1 oQ: F7 Damage Prevention: EJ D&A: Inspection Summary May 12, 2022: (1.0 Standard Prep) Reviewed the Nampa LNG plant Records, Emergency Manual, Fire Manual, Operations Procedure Manual, Preventative Maintenance Guide, Plant Maintenance Training Manual, Equipment Operations Manual and Security Training Manuals for compliance with 49 CFR part 193, NFPA 59A. Prepared for the LNG inspection through review of the inspection forms and 2018 Procedural & 2021 Records inspection results. May 16-18, 2021: (9.0 Standard) Bruce Perkins, Jeff Brooks and Matt Galli of the Idaho Public Utilities Commission met with Intermountain Gas Company Nampa LNG Plant personnel Russ Nishikawa,Tim Murray, Colleen Villegas and Colby Lundstrom to conduct an audit of records and field review for plant operations for calendar year 2021 and Procedural Manuals. The PHMSA Inspector Assistant (IA) Program was used to conduct a LNG Facility Inspection on the records,field and procedural manual as they applied to the facility. An IA Post Inspection Preliminary Findings (exit interview)was performed following the inspection with Colby Lundstrom Compliance/Audit Manager). May 19, 2022: (.5 Standard Post) Completed forms and typed report. Recommendations are listed on IA Post Inspection Preliminary Findings (attached). Attached: IPUC Form 1, Inspection Summary IA Post Inspection Preliminary Findings Corrective Action Required: Yes No X Follow-up Required: by(date): No X Inspector (Lead): ,;' Date: Perkins 19-May-22 Reviewer: Date: Brooks •/6- IPUC Form 1