Loading...
HomeMy WebLinkAboutIntermountain Gas 220314-17 Nampa Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): Mar 14-17, 2022 Company/Owner: Intermountain Gas Company Unit/OPID: I Nampa Field Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 5.5 Standard:F5 Construction: F-1 Training: F__] (T)(D) Integrity Management: E:1 Incident: E] M/M: F7 Follow-up: F-1 OQ: 0.5 Damage Prevention: D&A: a Inspection Summary Audit consisted of inspecting field installed equipment for the Nampa, Idaho inspection units. The PHMSA IA question set and IGC equipment listing were used as a guide throughout the audit to ensure all areas were completed/covered. Records (28-29 Mar 22) and procedures (1 Feb 22) for all Idaho Intermountain Gas Units were inspected at the Intermountain Gas Company(IGC) headquarters in Boise, Idaho. January 27, 2022: (0.5 Standard Prep) Prepared for IGC Nampa Field Audit March 14-16, 2022: (3.5 Standard 0.5 OQ) Met with IGC company representatives in the Nampa district office for in-brief and to begin field audit and review OQ records for all personnel taking part in the inspection. Regulator Stations 48325-RS-60738, 48325-RS-59705, 48321-RS-59930,48321-RS-59936, 48318-RS-59835, 30129,48321-RS-59737,48321-RS-59722, 48318-RS-59834,48318-RS-59836, 48318-RS-59808,48318-RS- 59839,48267-RS-59883,48267-RS-59862,48267-RS-59881, 48263-RS-59863,48263-RS-59728,48371-RS- 59985,48371-RS-59978, 48363-RS-59909,48363-RS-59887, 48367-RS-59888, and 48367-RS-59916 were inspected for proper operating parameters, regulator lock-up, relief device operation, cathodic protection pipe- to-soil readings, pipe-to soil interface wrap protection, station warning signs and right-of-way clearances. 20 casing-to-carrier isolation checks,five cathodic protection rectifiers, three pipeline patrols, and 17 emergency/isolation valves were checked for proper operation, observations listed below. An IPUC Form 3 (exit interview) was performed following the district inspection with Will Lindsey (Compliance/Audit Specialist) of Intermountain Gas Company. Observations: Reg Station: Failed lock-up Primary: 48325-RS-60738,48321-RS-59930,48321-RS-59936,48318-RS-59839, 48267-RS-59881, 48363-RS-598871 corrected on the spot. Reg Station: Failed lock-up Secondary: 48321-RS-59936, corrected on the spot. Low CP read: 48371-RS-59985 Reg Stations needing corrosion control/paint: 48318-RS-59839, 48363-RS-59909 Mar 17, 2022: (1 Standard Post) Completed forms and typed report. IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Field Equipment Status Worksheets Misc. photos PHMSA Form 15 OQ Field Corrective Action Required: Yes X No Follow-up Required: by(date): 15 Sep 22 Yes X No Inspector (Lead): Date: Bruce Perkins 3/17/2022 Reviewer: Date: \ Jeff Brooks ' \ IPUC Form 1