Loading...
HomeMy WebLinkAboutIntermountain Gas 220301-02 OQ - Boise Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 1-2 Mar 2022 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type&Time (1 day) I Total Inspection Days: 1 Standard:F] Construction: F] Training: F__] (T)(D)Integrity Management: E:l Incident: El M/M: F7 Follow-up: F-1 oQ: � Damage Prevention: D&A: Inspection Summary A OQtraining inspection was performed on Das-Co personnel at IGC's Boise office. 1-2 Mar 2022 (1.0 OQ Training) On 1-2 Mar we observed Das-co gas crews being classroom trained,taking written test and hands on training by IGC's training crew on Met Fits, Electro Fusion,Stab Fittings, Butt Fusion, Destructive testing Butt Fusion and Electro Fusion joints was performed by IGC personnel Attachments: Attendance sheets for all training classes Corrective Action Required: Follow-up Required: Yes No X Yes NoF X by(date): Inspector (Lead): ;' Date: Bruce Perkins G 3/2/2022 Reviewer: Date: Jeff Brooks -� - IPUC Form 1