HomeMy WebLinkAboutIntermountain Gas 220215-16 OQ - Jerome Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins/Brooks I Date(s): 15-16 Feb 2022
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days:1 4
Standard:F—] Construction: FTI Training: F—] (T)(D) Integrity Management: Incident:
M/K = Follow-up: OQ: F3 ] Damage Prevention: D&A:
Inspection Summary
A training program inspection was performed on IGC, KV and Track personnel at IGC's Jerome office.
Additionally we did a new construction inspection on the NEO RNG project.
15-16 Feb 2022 (2.0 Training 1.0 Construction 1.0 Travel)
On 15-16 Feb IPUC traveled to/returned from Twin Falls where we observed IGC and KV gas crews being
classroom trained,taking written test and hands on training by IGC's training crew on Met Fits, Electro Fusion,
Stab Fittings, Butt Fusion, Cutting as well as destructive testing Butt Fusion and Electro Fusion joints.
Additionally on 15 Feb we observed Das-Co personnel fusing and trenching on the NEO RNG piping in Filer,
Idaho
Attachments:
Attendance sheets for all training classes
Corrective Action Required: Follow-up Required: Yes No X
Yes No FX I by (date):
Inspector(Lead): Date:
Bruce Perkins i '1L !' -�^ 2/16/2022
Reviewer: Date:
Jeff Brooks
IPUC Form 1