Loading...
HomeMy WebLinkAboutDouglas Pipeline Company 221212-13 OQ Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks, Galli I Date(s): 12/12-13/2022 Company/Owner: Douglas Pipeline Company(DPC) I unit#/OPID 131442 Inspection Type &Time (1 day,0.5 day) I Total Inspection Days: 4.5 Standard: 4.5 Construction: 71 Training: F-] (T)(D) Integrity Management: E] Incident: EJ Gas Rule: F] Follow-up: Oct: Damage Prevention: D&A: Inspection Summary Audit consisted of IPUC inspectors reviewing Douglas Pipeline Companies (DPC) procedures for compliance with Part 192. This audit was completed virtually from the IPUC office in Boise, ID. November 28, 2022: 1 Standard Prep IPUC inspectors prepared for DPC procedural audit. Reviewed Operations and Maintenance Manual, IA question set and past inspections. December 12, 2022: 3 Standard Virtually met with Douglas Pipeline Company representative Andi Shacklett, Director of Regulatory Compliance to audit the companies procedures. Reviewed various documents to include Idaho Power Online Library, O&M Manual, Emergency Plan, Public Awareness Plan, OQ plan, Form 51 - After Action Review, Form 53, Emergency Response Checklist, SOP-22A-High Consequence Area Analysis, SOP-30 Startup & Shutdown, SOP-05B Leak Investigation, SOP-06 Annual Valve Inspection, SOP 30a Purge Plan, SOP 1- ROW inspection, Form 50 - AOC report, SOP 9 - Atmospheric Corrosion, Form 54 - Pipe Condition Report. An IA exit interview was conducted and results were sent to Andi Shacklett. All procedures were found to be compliant with Part 192. December 14, 2022: .5 Standard Post Completed IPUC Form 1 and IA exit interview. Corrective Action Required: Yes I Nol X Follow-up Required: by (date): YesINol X Inspector (Lead): Date: 12/14/2022 Perkins Reviewer: Date: 12/14/2022 Brooks IPUC Form 1