Loading...
HomeMy WebLinkAboutDouglas Pipeline Company 221012 OQ Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Brooks, Perkins, Galli Date(s): 10/12/2022 Company/Owner: I Douglas Pipeline Company(DPC) Unit/OPID: 1 31442 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 2.5 Standard:71 Construction: 71 Training: [7 (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: 2.5 Damage Prevention: D&A: Inspection Summary October 4,2022: (0.5 Standard Prep) Prepared for DPC OQ program audit. October 12,2002: (1.5 Standard) IPUC inspectors Brooks, Perkins and Galli met virtually to conduct an audit with Andrea Shacklett, Director of Regulatory Compliance for Douglas Pipeline Company, a contractor for Idaho Power Company. Observations included reviewing DPCs OQ Program, Emergency Response Plan, Operations and Maintenance Manual and various OQ records. October 12,2002: (0.5 Standard Post) Attached: IPUC Form 1, Inspection Summary IA Post Inspection Preliminary Findings Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: ----�._- 10/12/2022 Brooks Reviewer: Date: 10/12/2022 Galli l IPUC Form 1