Loading...
HomeMy WebLinkAboutDouglas Pipeline Company 220913 Drug and Alcohol Idaho PUC Pipeline Safety Inspection Summary Inspector(s): 1perkins, Galli I Date(s): 13-Sep-22 Company/Owner: I Douglas Pipeline Company(DPC) Unit#/OPID 131442 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:13 Standard:F-] Construction:F-1 Training: F__] (T)(D) Integrity Management: E:1 Incident: E] Gas Rule: a Follow-up: F-1 oQ: F-1 Damage Prevention: E] D&A: E3 Inspection Summary Audit consisted of Idaho PUC inspectors Perkins and Galli reviewing DPCs Drug and Alcohol Program for compliance with Part 40 and Part 199 with Andrea Shacklett(Director of Regulatory Compliance). September 12,2002: (0.5 Standard Prep) Prepared for Drug and Alcohol program audit. September 13, 2022: (2.0 Standard) Audit included review of DPC 2022 Drug and Alcohol Program and appendances, drug and alcohol records and PHMSA IA question set. Three concerns were found that need to be corrected. Question 9: Return-to-Duty Alcohol Testing-Add referral (a) As an employee, when you have violated DOT drug and alcohol regulations, you cannot again perform any DOT safety-sensitive duties for any employer until and unless you complete the SAP evaluation, referral, and education/treatment process set forth in this subpart and in applicable DOT agency regulations. The first step in this process is a SAP evaluation. Question 10: Follow-Up Alcohol Testing-Add alcohol Need to add alcohol to the follow-up testing as required by 199.225D, operators D&A manual pg 18 section F only states drugs. Question 13: Prohibited from performing covered tasks-Cite code 199.225(e) Change to cite code: e), "Each employer shall retest a covered employee to ensure compliance with the provisions of 199.237, if an employer chooses to permit the employee to perform a covered function within 8 hours following the administration of an alcohol test indicating an alcohol concentration of 0.02 or greater but E BT.04." September 15, 2022: (0.5 Standard Post) Typed the inspection report, completed forms, IPUC Form 1 & Exit Interview and attached inspection documents. Attached: IPUC Form 1, Inspection Summary Post-Inspection Written Preliminary Findings- Exit Interview IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Corrective Action Required: Yes x No Follow-up Required: by (date): 24 Oct 2022 Yes x No Inspector (Lead): / '' Date: Perkins Reviewer: Date: Brooks 17-)-7-�� IPUC Form 1