HomeMy WebLinkAboutDouglas Pipeline Company 220913 BMT & LG Field Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): jPerkins, Galli Date(s): 13-Sep-22
Company/Owner: I Douglas Pipeline Company Unit#/OPID 31442
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:13
Standard:F3 Construction: F] Training: F—] (T)(D) Integrity Management: Incident:
Gas Rule: = Follow-up: a OQ: Damage Prevention: D&A:
Inspection Summary
Audit consisted of inspecting field installed operating equipment for Douglas Pipeline Companies Langley-
Gulch LG(New Plymouth) and Bennett Mountain BMT(Mountain Home) districts.
September 7,2022: (0.5 Standard Prep)
Preparation for Langley Gulch and Bennett Mountain Field Audits
September 12,2022: (2.0 Standard)
Audit included: 19 CP test station readings, verification of valve functionality(LG -V1001, V 1002, V 1003,
V 1004; BMT -V 1 and V2) and ROW line marker inspections.
Observations include: Multiple ROW line markers along the LG ROW that need to be replaced due to fading
and peeling. Multiple badger holes were found in the vicinity of the BMT ROW and one hole had line locating
tape pulled out of the hole.
September 14,2022: (0.5 Standard post)
Wrote the inspection report, completed audit forms: PHMSA IA question set, IPUC Forms 1, 3 and attached
inspection documents.
Attached:
IPUC Form 1, Inspection Summary
IPUC Form 3, Exit Interview
IPUC Field Equipment Status Worksheets
PHMSA Form 15 OQ Field
Corrective Action Required: Yes X No
Follow-up Required: by(date): Yes X No
Inspector(Lead): %? Date:
Perkins r Gf /� �
v
Reviewer: Date:
Brooks q•- .
IPUC Form 1