Loading...
HomeMy WebLinkAboutDouglas Pipeline Company 220812 Section 114 Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks, Galli I Date(s): 8/12/2022 Company/Owner: iDouglas Pipeline Unit/OPID: 131442 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:10.5 Standard: 0.5 Construction: F7 Training: (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: a D&A: Inspection Summary Joint audit was conducted by Wayne Chan from PHMSA Eastern Region for compliance with Section 114 criteria. IPUC is accepting the results of this inspection and agreed with findings/concerns, based upon Douglas Pipelines answers to question sets. Attached: IA Exit Interview Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X inspector(Lead): Date: Perkins 8/12/2022 Reviewer: Date: Brooks 8/12/2022 IPUC Form 1