Loading...
HomeMy WebLinkAboutDominion 210628-0721 Integrity Dig Franklin Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins/Brooks I Date(s): jJun 28-1 Jul 21 Company/Owner: DEUWI Unit/OPID: I Franklin Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 13 Standard: Construction: Training: F3 (T)(D) Integrity Management: 9.5 Incident: M/M: Follow-up: OQ: 0.5 Damage Prevention: D&A: Inspection Summary Audit consisted of DEUWI Integrity Management (IM)verification dig in Franklin, Idaho and a visit to Their training center in Salt Lake City to observe fire and welding training. Jun 28, 2021: (3 TIMP travel) Travel to Logan, Utah to meet with DEUWI personnel for the IM verification dig. Jun 29,2021: (3.0 Training) Visited training center in Salt Lake City to observe fire and welding training classes and their capabilities. Jun 30,2021: (2.5 TIMP, .5 OQ) Observed IM verification dig at Hwy 91N mile marker 2, Franklin, Idaho. WC crew exposed 10" FBE coated steel line for a visual check. Calibration on holiday detection device (Jeep) was expired. Work stopped for the day until they could get a calibrated device. Jul 1,2021: (3)TIMP &travel) Approx. 12" of the 10" pipe was jeeped, cleaned, sandblasted,verification of seam type (ERW) and remaining wall thickness noted. No anomalies identified. DEUWI personnel completed a soil resistivity test and checked anode output.The pipe was primed and wax wrap applied.Traveled back to Boise. Jul 6,2021: (1)TIMP completion) Completed forms and typed report. Attached: IPUC Form 1, Inspection Summary PHMSA Form 15 OQ Field Photo's, dig ticket and other pertinent information Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector(Lead): Date: Reviewer: Date: l.e J�ti 1 IPUC Form 1