Loading...
HomeMy WebLinkAboutDominion 210614-17 Integrity Dig Franklin Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer I Date(s): jJun 14-17, 202 Company/Owner: DEUWI Unit/OPID: I Franklin Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4 Standard: Construction: Training: (T)(D) Integrity Management: 3.5 Incident: M/M: Follow-up: OQ: 0.5 Damage Prevention: D&A: Inspection Summary Audit consisted of Dominion Energy Utah/Wyoming/Idaho (DEUWI) Integrity Management (IM) verification dig in Franklin, Idaho. Jun 14, 2021: (1 TIMP travel) Travel to Logan, Utah to meet with DEUWI personnel for the IM verification dig. Jun 15-16, 2021: (1.5 TIMP, .5 OQ) Observed IM verification dig at 175 S Hwy 91, Franklin, Idaho, Whitaker Construction crew exposed 10" FBE coated steel line that was identified during the survey to have an anomaly. They did a visual check,jeeped pipe and CP tech did a soil resistivity test and checked anode output. The crew found coating issues on a compression sleeve and a spot at the 6 o'clock position on the pipe. Approx. 24' of the 10" pipe was cleaned, sandblasted, 2-part epoxied, and wax wrapped at the transition. Flow sand was used as backfill. Jun 17, 2021: (1 TIMP) Traveled back to Boise, completed forms and typed report. Attached: IPUC Form 1, Inspection Summary PHMSA Form 15 OQ Field Corrective Action Required: Yes No X Follow-up Required: #y( e : Yes No X Inspector (Lead): Date: i J"IN 2i Reviewer: Date: IPUC Form 1