Loading...
HomeMy WebLinkAboutDominion 221108 Section 114 Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks, Galli Date(s): 11/8/2022 Company/Owner: Dominion Energy-Western Division (DEUWI) Unit/OPID: 112876 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 3.5 Standard: 3.5 Construction:F] Training: F__] (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Joint audit consisted of Idaho,Wyoming and Utah inspecting DEUWI for compliance with Section 114 criteria. October 27,2022 (.5 Standard Prep) Prepared for Section 114 audit of DEUWI. Reviewed operators Standard Practices, Section 114 Memo and IA Question set. November 8,2022 (3 Standard) Met virtually with DEUWI compliance personnel to audit Section 114. Standard Practices, DIMP, Emergency Plan and engineering reviews were reviewed and discussed. An IA exit interview was conducted with Steve Bursett,Reid Hess,Miriam Santos and Chris Burnett with DEUWI. No discrepancies were found. Attached: IA Exit Interview Corrective Action Required: Yes No X Follow-up Required: by (date : Yes No X Inspector(Lead): Date: Perkins �j 1 �� 11/8/2022 Reviewer: Date: Brooks - 11/8/2022 fl IPUC Form 1