Loading...
HomeMy WebLinkAboutDominion 221021 Preston Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins, Galli I Date(s): 21-Oct-22 Company/Owner: I Dominion Energy(DEUWI) Unit#/OPID 112876 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4 Standard:F4 Construction:F� Training: F—] (T)(D) Integrity Management: Incident: Gas Rule: a Follow-up: Oct: Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting field installed operating equipment for the Dominion Energy Idaho inspection unit. October 20,2022: (1.0 Standard Travel) Traveled to Preston October 21,2022: (1.0 Standard) IPUC inspectors Perkins and Galli conducted a field audit of Dominion Energy's Preston District. Audit included: Verification of Karson Cook, Mike Thayne and Jason Valdez. 7 regulator stations (FR0001,FC0006, FC0005, FC0003, FC0001,FC0004, PS0001), 3 carrier/casings, 1 rectifiers, 9 control valves and no patrols. One regulator station(PS0001) failed lockup due to dithiazine issues on the primary worker regulator. Regulator was fixed on-site by cleaning the diaphragm and pilot stem. October 21,2022: (1.0 Standard Travel) Traveled from Preston October 24 ,2022: (0.5 OQ, 0.5 Standard post) Wrote the inspection report, completed audit forms: PHMSA IA question set, IPUC Forms 1, 3 and attached inspection documents. Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Field Equipment Status Worksheets PHMSA Form 15 OQ Field Corrective Action Required: Yes No X Follow-up Required: by(date): 12/12/2022 Yes X No Inspector (Lead): ,7 Date: Perkins `t Le 110/24/2022 Reviewer: Date: Brooks 10/24/2022 IPUC Form 1