HomeMy WebLinkAboutDominion 221021 Preston Field Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): jPerkins, Galli I Date(s): 21-Oct-22
Company/Owner: I Dominion Energy(DEUWI) Unit#/OPID 112876
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4
Standard:F4 Construction:F� Training: F—] (T)(D) Integrity Management: Incident:
Gas Rule: a Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
Audit consisted of inspecting field installed operating equipment for the Dominion Energy Idaho inspection unit.
October 20,2022: (1.0 Standard Travel)
Traveled to Preston
October 21,2022: (1.0 Standard)
IPUC inspectors Perkins and Galli conducted a field audit of Dominion Energy's Preston District. Audit
included: Verification of Karson Cook, Mike Thayne and Jason Valdez. 7 regulator stations (FR0001,FC0006,
FC0005, FC0003, FC0001,FC0004, PS0001), 3 carrier/casings, 1 rectifiers, 9 control valves and no patrols.
One regulator station(PS0001) failed lockup due to dithiazine issues on the primary worker regulator. Regulator
was fixed on-site by cleaning the diaphragm and pilot stem.
October 21,2022: (1.0 Standard Travel)
Traveled from Preston
October 24 ,2022: (0.5 OQ, 0.5 Standard post)
Wrote the inspection report, completed audit forms: PHMSA IA question set, IPUC Forms 1, 3 and attached
inspection documents.
Attached:
IPUC Form 1, Inspection Summary
IPUC Form 3, Exit Interview
IPUC Field Equipment Status Worksheets
PHMSA Form 15 OQ Field
Corrective Action Required: Yes No X
Follow-up Required: by(date): 12/12/2022 Yes X No
Inspector (Lead): ,7 Date:
Perkins `t Le 110/24/2022
Reviewer: Date:
Brooks 10/24/2022
IPUC Form 1