Loading...
HomeMy WebLinkAboutDominion 221018-19 Procedural Idaho PUC Pipeline Safety Inspection Summary Inspector(s): lPerkins, Brooks, Galli I Date(s): 10/18-19/2022 Company/Owner: I Dominion Energy(DEUWI) Unit#/OPID 112876 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 4 Standard:F4 Construction:F1 Training: F-] (T)(D) Integrity Management: F-1 Incident: El Gas Rule: 71 Follow-up: F-1 OQ: Damage Prevention: D&A: Inspection Summary Idaho PUC inspectors partnered with Wyoming state inspectors and conducted a Procedures Audit on Dominion Energy(DEUWI). 18-20 October 2022(4.0) standard,typed reports Used the IA inspection program, code books, applicable Dominion Energy Standard Procedures, Emergency Plan, API 1104 and other information/records provided by the operator to conduct a 2022 Procedures Audit. The inspection revealed that the operator procedures/records at the time of the inspection appeared to be out of compliance with applicable code sections: 192.619 Maximum allowable operating pressure: Steel or plastic pipelines. (a)No person may operate a segment of steel or plastic pipeline at a pressure that exceeds a maximum allowable operating pressure (MAOP)determined under paragraph(c), (d), or(e) of this section, or the lowest of the 192.747 Valve maintenance: Distribution systems. (b) Each operator must take prompt remedial action to correct any valve found inoperable,unless the operator designates an alternative valve. 192.605 Procedural manual for operations, maintenance,and emergencies. (b) Maintenance and normal operations. The manual required by paragraph(a) of this section must include procedures for the following, if applicable,to provide safety during maintenance and operations. (3)Making construction records,maps, and operating history available to appropriate operating personnel. 192.16 Customer notification. (c) Each operator shall notify each customer not later than August 14, 1996, or 90 days after the customer first receives gas at a particular location, whichever is later. However, operators of master meter systems may continuously post a general notice in a prominent location frequented by customers. Attachments IPUC Form 1 Post-Inspection Written Preliminary Findings 1A inspection LOC D202202 Corrective Action Required: I Yesl X I No Follow-up Required: by(date): 11/25/2022 Yes X No IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Inspector(lead): /! Date: Perkins ��� "�2,/ 10/20/2022 Reviewer: Date: Brooks 10/20/2022 IPUC Form 1