Loading...
HomeMy WebLinkAboutDominion 221017-18 PAP Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks, Galli I Date(s): jOct 17-18, 2022 Company/Owner: iDorninion Energy I Unit#/OPI 12876 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2.5 Standard: 2.5 Construction: Training: (T)(D) Integrity Management: =Incident:= Gas Rule: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary The Idaho PUC inspectors partnered with Utah and Wyoming state inspectors and conducted a Public Awareness Program Inspection on Dominion Energy(DEUWI). 17-18 October 2022 (2.5) standard,typed reports Used the IA inspection program, code books, Dominion Energy Public Awareness Plan,API 1162 and other information/records provided by the operator to conduct a 2022 Public Awareness audit. The inspection revealed that the operator procedures/records at the time of the inspection appeared to be out of compliance with applicable code 192.616(c)and API 1162,First Edition, Demember 2003 - 8.4.4 Measure 4 -Achieving Bottom-Line Results at it relates to tracking near misses. Attachments: IPUC Form 1 Post-Inspection Written Preliminary Findings lA inspection LOC D202201 Corrective Action Required: Yes X No Follow-up Required: by(date): 1�/25/2022 Yes X No Inspector (Lead): Date: Perkins 10/19/2022 Reviewer: Date: 10/19/2022 Brooks IPUC Form 1