Loading...
HomeMy WebLinkAboutDominion 220217-23 ERP Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks Date(s): 17,22-23 Feb 2022 Company/Owner: IDEUWI Unit/OPID: 12a�6 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4 Standard:74 Construction:F-1 Training: F__] (T)(D) Integrity Management: EJ Incident: F7 Gas Rule: F] Follow-up: 71 oct: F-1 Damage Prevention: El D&A: El Inspection Summary The state of Idaho partnered with Utah/Wyoming Inspectors and conducted a Virtual-Teams Meeting Distribution/Transmission 3 yr Emergency Plan Review. 17 Feb 2022 (1.0 Standard Prep) Prepared for DEUWI Emergency Plan Review through review of PHMSA IA question set, 2019 inspection results and 2022 Emergency Plan. 22-23 Feb 2022: (3.0 Standard,typed report) Reviewed both the Distribution/Transmission Emergency Plans, Records,Training requirements and operations of the Dispatch center and how they work with local 911 personnel.No discrepancies were noted throughout the audit and IA close out letters were sent to the operator. Attached: IA Post-Inspection Written Preliminary Findings Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X spector (Lead): �.� Date:In Bruce Perkins 23-Feb-22 Reviewer: Date: Jeff Brooks ad Itr IPUC Form 1