Loading...
HomeMy WebLinkAboutAvista 220818 Avista Sandpoint Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): JBrooks, Galli Date(s): 18-Aug-22 Company/Owner: lAvista Utilities I Unit#/OPID 131232 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days:11 Standard: Construction: Training: (T)(D)Integrity Management: Incident: Gas Rule: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on NPL, a contractor for Avista Utilities. 18 Aug 2022 (1.0) construction,typed reports IPUC inspectors observed a NPL crew install a 2" service lines to an uprated meter set for an industrial building at 1200 Turbine Dr, Sandpoint, ID that included trenching,tracer wire, lyco fittings,bedding/backfill. Verified OQs of three NPL employees. Quizzed employees on applicable AOCs. All procedures were followed. Attachments: IPUC Form 4 Construction Inspections Das-Co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket and other pertinent paperwork Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead): Date: Brooks ALL�— 8/18/2022 Reviewer: Date: Galli 8/18/2022 IPUC Form 1