Loading...
HomeMy WebLinkAboutAvista 220512 Avista Deary Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Brooks/Galli I Date(s): 12-May-22 Company/Owner: Avista Utilities Unit/OPID: 31232 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 3 Standard: Construction: F2.5 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: 0.5 Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Avista Utilities. 12 May 2022 (2.5) construction) (.5) OQ Observed a Avista crew repairing/straightening a valve box PUM 1117 at old Hwy 8 and Watermill road in Deary, ID.Also observed crew installing snow/protective shed at 305 Idaho St in Deary, Idaho All procedures were followed. Reports and forms produced for inspection activities. Areas observed during this project were: Excavation, backfilling, line locating and setting concrete footings. Attachments: IPUC Form 4 Construction Inspections Project Photos Dig Ticket OQ Documents for Avista employees Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X inspector(Lead): Date: Perkins ' �r-'`� 12-May-22 Reviewer: Date: It•ar- IPUC Form 1