HomeMy WebLinkAboutAvista 220512 Avista Deary Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins/Brooks/Galli I Date(s): 12-May-22
Company/Owner: Avista Utilities Unit/OPID: 31232
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 3
Standard: Construction: F2.5 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: 0.5 Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Avista Utilities.
12 May 2022 (2.5) construction) (.5) OQ
Observed a Avista crew repairing/straightening a valve box PUM 1117 at old Hwy 8 and Watermill road in
Deary, ID.Also observed crew installing snow/protective shed at 305 Idaho St in Deary, Idaho All procedures
were followed. Reports and forms produced for inspection activities.
Areas observed during this project were: Excavation, backfilling, line locating and setting concrete footings.
Attachments:
IPUC Form 4 Construction Inspections
Project Photos
Dig Ticket
OQ Documents for Avista employees
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
inspector(Lead): Date:
Perkins ' �r-'`� 12-May-22
Reviewer: Date:
It•ar-
IPUC Form 1