HomeMy WebLinkAboutAvista 220608 CDA Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Brooks, Perkins, Galli Date(s): 6/7-6/8 Company/Owner: jAvista CDA Unit/OPID: 31232 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 7 Standard:F6 Construction:F-1 Training: F-] (T)(D) Integrity Management: E::] Incident: 0.5 Gas Rule: F] Follow-up: = oQ: 0.5 Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting field installed operating equipment for the Avista Coeur D'Alene,Idaho inspection unit. Records and procedures for all Idaho Avista units were inspected March 16-17,2021 virtually from our office in Boise,Idaho. February 17, 2022: (0.5 Standard Prep) Prepared of CDA Field Audit June 8,2022: (2.0 Standard, 0.5 Incident and 0.5 OQ) IPUC inspectors Brooks, Perkins and Galli conducted a field audit of Avista's CDA district. Audit included: Review of construction records,welding records, emergency manual, verification of Steve Finney's OQs, 7 regulator stations (212, 214, 4246, 4247, 2210, 220, 5001-1) 6 carrier/casings,4 rectifiers, 16 control valves and no patrols. Traffic control was utilized for several control valves. Visited 6997 W Christine St in Rathdrum Idaho which was the site of federal reportable incident 20210098-36039. Took photos and examined scene of house explosion. Three regulator stations (212, 4246, 4247) failed lockup due to dithiazine issues. All were fixed on-site by replacing pilot stems or diaphragm. Failed regulator stations will be revisited in 2023. Reference photos saved in CDA field audit folder. June 9,2022: (3 Standard Travel) Traveled from Coeur D'Alene June 16,2022: (.5 Standard post) Wrote the inspection report, completed audit forms: PHMSA IA question set, IPUC Forms 1, 3 and attached inspection documents. Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Field Equipment Status Worksheets PHMSA Form 15 CQ Field Letter of Concern will be written for regulator stations that failed to lock up due to dithiazine issues. Photos of federal reportable incident 20210098-36039 IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Corrective Action Required: Yes No X Follow-up Required: by (date): 2023 Field Audit Yes X No Inspector (Lead): 1 Date: 6/9/2022 Perkins Reviewer: Date: 6/9/2022 Brooks IPUC Form 1