HomeMy WebLinkAboutAvista 220608 CDA Field Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Brooks, Perkins, Galli Date(s): 6/7-6/8
Company/Owner: jAvista CDA Unit/OPID: 31232
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 7
Standard:F6 Construction:F-1 Training: F-] (T)(D) Integrity Management: E::] Incident: 0.5
Gas Rule: F] Follow-up: = oQ: 0.5 Damage Prevention: D&A:
Inspection Summary
Audit consisted of inspecting field installed operating equipment for the Avista Coeur D'Alene,Idaho
inspection unit. Records and procedures for all Idaho Avista units were inspected March 16-17,2021
virtually from our office in Boise,Idaho.
February 17, 2022: (0.5 Standard Prep)
Prepared of CDA Field Audit
June 8,2022: (2.0 Standard, 0.5 Incident and 0.5 OQ)
IPUC inspectors Brooks, Perkins and Galli conducted a field audit of Avista's CDA district. Audit included:
Review of construction records,welding records, emergency manual, verification of Steve Finney's OQs, 7
regulator stations (212, 214, 4246, 4247, 2210, 220, 5001-1) 6 carrier/casings,4 rectifiers, 16 control valves and
no patrols. Traffic control was utilized for several control valves. Visited 6997 W Christine St in Rathdrum
Idaho which was the site of federal reportable incident 20210098-36039. Took photos and examined scene of
house explosion.
Three regulator stations (212, 4246, 4247) failed lockup due to dithiazine issues. All were fixed on-site by
replacing pilot stems or diaphragm. Failed regulator stations will be revisited in 2023. Reference photos saved in
CDA field audit folder.
June 9,2022: (3 Standard Travel)
Traveled from Coeur D'Alene
June 16,2022: (.5 Standard post)
Wrote the inspection report, completed audit forms: PHMSA IA question set, IPUC Forms 1, 3 and attached
inspection documents.
Attached:
IPUC Form 1, Inspection Summary
IPUC Form 3, Exit Interview
IPUC Field Equipment Status Worksheets
PHMSA Form 15 CQ Field
Letter of Concern will be written for regulator stations that failed to lock up due to dithiazine issues.
Photos of federal reportable incident 20210098-36039
IPUC Form 1
Idaho PUC Pipeline Safety Inspection Summary
Corrective Action Required: Yes No X
Follow-up Required: by (date): 2023 Field Audit Yes X No
Inspector (Lead): 1 Date: 6/9/2022
Perkins
Reviewer: Date: 6/9/2022
Brooks
IPUC Form 1