Loading...
HomeMy WebLinkAboutAvista 220601 Section 114 Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 1-Jun-22 Company/Owner: Avista Unit/OPID: 1 114/31232 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 1 Standard:F-1-1 Construction:E-1 Training: (T)(D)Integrity Management: Incident: M/W = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary 2022 Section 114 Avista Utilities 1 Jun 2022: (1 Standard) Reviewed Avista's Section 114 checklist answers that were received on 26 April 22 from Randy Bareither. Coordinated with Oregon PUC on 4 May 2022 that they would add us to their already scheduled Section 114 audit. Reviewed Oregon PUC's Section 114 audit results on 1 Jun 2022 and concurred with the results that Kevin Hennessy approved on 17 May 2022. IPUC will utilize this inspection to satisfy the PHMSA Section 114 inspection requirements. Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead): Bruce Perkin Date: Perkins 1-Jun-22 Reviewer: Date: IPUC Form 1