HomeMy WebLinkAboutAvista 220601 Section 114 Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins I Date(s): 1-Jun-22
Company/Owner: Avista Unit/OPID: 1 114/31232
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 1
Standard:F-1-1 Construction:E-1 Training: (T)(D)Integrity Management: Incident:
M/W = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
2022 Section 114 Avista Utilities
1 Jun 2022: (1 Standard)
Reviewed Avista's Section 114 checklist answers that were received on 26 April 22 from Randy Bareither.
Coordinated with Oregon PUC on 4 May 2022 that they would add us to their already scheduled Section 114
audit. Reviewed Oregon PUC's Section 114 audit results on 1 Jun 2022 and concurred with the results that Kevin
Hennessy approved on 17 May 2022. IPUC will utilize this inspection to satisfy the PHMSA Section 114
inspection requirements.
Attached:
IPUC Form 1, Inspection Summary
IPUC Form 3, Exit Interview
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector(Lead): Bruce Perkin Date:
Perkins 1-Jun-22
Reviewer: Date:
IPUC Form 1