HomeMy WebLinkAboutAvista 220509-13 Moscow Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Brooks/Galli I Date(s): May 9-11&13 2022 Company/Owner: I Avista Utilities Unit/OPID: Moscow/31232 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 12.5 Standard: 12.0 Construction: Training: (T)(D)Integrity Management: Incident:El I M/M: F7 Follow-up: F] OQ: 0.5 Damage Prevention: El D&A: Inspection Summary Audit consisted of inspecting field installed operating equipment for the Avista Moscow,Idaho inspection unit. February 14, 2022: (0.5 Standard Prep) Prepared for Moscow Field Audit. May 9,2022: (3 Standard travel) Traveled to Moscow, ID to conduct inspection. May 10-11,2022: (5.5 Standard, .5 OQ) Met with Avista company representatives in the Pullman, Washington district office for in-brief and began field audit of Moscow installed equipment. Regulator Stations 307,323,329,332,333,335,367,3785,3065 and 3130 were randomly selected and inspected for relief operation, regulator lock-up and general condition of the station including pipe-to-soil wrap and corrosion. Three cathodic rectifiers,ten valves and five carrier-to-casings were inspected for the Moscow district . IPUC Form 3 was conducted with Randy Bareither. May 13, 2022: (3 Standard travel) Traveled back to Boise, ID. Wrote the inspection report, completed all forms and attached inspection document Attached: PHMSA Form 2,IA Equivalent, Field Portion(Not attached) PHMSA Form 15, OQ Field IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview 1PUC Field equipment Work sheets Corrective Action Required: Yes Nol X Follow-up Required: 0*(date): Yes Nol X Inspector(Lead): Date: Perkins 13-May-22 Reviewer: Date: Brooks O�L 1-1 - IPUC Form 1