HomeMy WebLinkAboutAvista 220509-13 Moscow Field Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Brooks/Galli I Date(s): May 9-11&13
2022
Company/Owner: I Avista Utilities Unit/OPID: Moscow/31232
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 12.5
Standard: 12.0 Construction: Training: (T)(D)Integrity Management: Incident:El I
M/M: F7 Follow-up: F] OQ: 0.5 Damage Prevention: El D&A:
Inspection Summary
Audit consisted of inspecting field installed operating equipment for the Avista Moscow,Idaho
inspection unit.
February 14, 2022: (0.5 Standard Prep)
Prepared for Moscow Field Audit.
May 9,2022: (3 Standard travel)
Traveled to Moscow, ID to conduct inspection.
May 10-11,2022: (5.5 Standard, .5 OQ)
Met with Avista company representatives in the Pullman, Washington district office for in-brief and began
field audit of Moscow installed equipment.
Regulator Stations 307,323,329,332,333,335,367,3785,3065 and 3130 were randomly selected and inspected
for relief operation, regulator lock-up and general condition of the station including pipe-to-soil wrap and
corrosion. Three cathodic rectifiers,ten valves and five carrier-to-casings were inspected for the Moscow
district . IPUC Form 3 was conducted with Randy Bareither.
May 13, 2022: (3 Standard travel)
Traveled back to Boise, ID. Wrote the inspection report, completed all forms and attached inspection document
Attached:
PHMSA Form 2,IA Equivalent, Field Portion(Not attached)
PHMSA Form 15, OQ Field
IPUC Form 1, Inspection Summary
IPUC Form 3, Exit Interview
1PUC Field equipment Work sheets
Corrective Action Required: Yes Nol X
Follow-up Required: 0*(date): Yes Nol X
Inspector(Lead): Date:
Perkins 13-May-22
Reviewer: Date:
Brooks
O�L 1-1 -
IPUC Form 1