HomeMy WebLinkAboutIntermountain Gas 231206 - Idaho Falls HPSS Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): jBrooks, Galli I Date(s): 12/6/2023
Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1.5
Standard: 1.5 Training: (T)(D) Integrity Management: Incident:
Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
December 6, 2023: 1.0 Standard
IPUC inspectors Brooks and Galli conducted a standard inspection of 20 HPSS's (Farm Taps) in the towns of
Firth, Basalt and Shelley of the Idaho Falls District. Inspected HPSS Maximo ID and addresses can be found on
the HPSS checklist. Two farm taps (64769 & 64774) were found with leaks and comfirmed with a bubble test.
IGC leak line was notified. Confirmation numbers are: 4275482977 and 4248489745.
December 11, 2023:0.5 Standard Post
Wrote form 1 and letter for leaking HPSS's
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (Lead):
Galli ,-�� Date: 12/11/2023
Reviewer: _�----�Brooks Date:
IPUC Form 1