Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 231130 Meridian Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 11/30/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: City/District: Meridian 4932, (4924, 4916 , 4908,4900) N Palustris Way Contractor/Job #: Foreman: Employee: See Lineup 371- 50278, 50279, 52138 Jose Maceda Job Description: '/4" Service Lines Circle: Distribution Operator Supervisor: Mingo One-Call Ticket: 470064, 470066,470067 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Sand Used SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer: See pics Pressure Gauge: See pies 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Dasco, a contractor for IGC install 3/" service lines in Meridian, ID. Address: 4932, 4924 & 4916 N Palustris Way(Split Service, EFV 1200 to 4924 and 4916, 3 homes total) Observations Include: correct trench depth, safety equipment, tracer wire, verification of proper OQ credentials, verification of equipment calibrations, butt fusion to the stub, bedding with sand, backfill and continuity tests. Quizzed employees on AOCs of fusion and squeeze off procedures for+/- 32- degree weather. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Address: 4908 & 4900 N Palustris Way(Split Service, one EFV 1200 for 2 homes) Observations Include: correct trench depth, safety equipment, tracer wire, verification of equipment calibrations, successful pressure test, butt fusion to the stub, stab fitting (90 degree), squeeze off procedures, bedding with sand and backfill. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Galli - Date: 11/30/2023 Reviewer: Brooks Date: IPUC Form 4 Rev. April 2023