Loading...
HomeMy WebLinkAboutIntermountain Gas 231129 Meridian Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 11/29/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: Franklin Road and Baraya Way City/District: Meridian Contractor/Job#: Foreman: Employee: N/A 413-1974 Blaine Ivernon Job Description: Install 2" Main and 1/4" Stubs Circle: Distribution Operator Supervisor: Will One-Call Ticket: 480915, 480918 On-Site: N Total Inspection Days: 0.5 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 At least 36" for Main OPS 322 Lines 3. Bedding/Backfill SAT OPS 308 Sand Used SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer: See pies Pressure Gauge: See pies 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 IPUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Probst, a contractor for IGC install 2"main with 3/4' service line stubs in Meridian, ID. Address: Intersection of Franklin Road and Baraya Way Observations Include: correct trench depth, safety equipment, tracer wire, verification of equipment calibrations, butt fusion (2" T's and 90s),bedding with sand and backfill. Quizzed employees on AOCs of fusion procedures. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Galli ' Date: 11/29/2023 Reviewer: ` Brooks Date: IPUC Form 4 Rev. April 2023