HomeMy WebLinkAboutIntermountain Gas 231121 Meridian Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 11/21/2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: 5054 W Oakford Dr City/District: Meridian
Contractor/Job#: Foreman: Employees: See job list
051725-371 Librado Ruiz-Sanchez
Job Description: 3/4" Service Line installs Circle: Distribution
Operator Supervisor: One-Call Ticket 441541
On-Site: Y John Hezeltine
Total Inspection Days: 1
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O &M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 92 PSI
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pics in file
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
1 P U C Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co a contractor for IGC install a 1/4" service in Meridian, Idaho.
To addresse(s):5054 W Oakford Dr. Observations included: Safety equipment, trenching, line-locating,
tracer wire install, bedding, pressure test,purging, backfilling, stab fittings. and fusing. Quizzed fuser
on squeeze/release times and inspection of pipe ends after heating. All procedures were observed in
compliance with IGCs Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead):
'f �^ Date: 11/21/2023
Perkins �---
Reviewer:
Brooks Date:
IPUC Form 4 Rev. April 2023