HomeMy WebLinkAboutIntermountain Gas 231115 Nampa Construction IPUC Construction Inspection Inspector(s): Brooks Date(s): 11/15/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 3184 E Mossy Rock Ct City/District: Nampa Contractor/Job #: Foreman: Employees: On File 371-3027 Rigo Chavarin Job Description: 1/4" Service Line installation Circle: Distribution Operator Supervisor: One-Call Ticket: 451390 On-Site: N Total Inspection Days: 1 Tasks: Ratinp, Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 PSIG for 15 minutes, Pneumatic. 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 15. EFV Installation SAT OPS 301 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 20. Line Locating SAT OPS 611 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Brooks observed Das-Co, a contractor for IGC install a 1/4" service at 3184 E Mossy Rock Ct in Nampa, Idaho. Observations included safety equipment, trenching, line-locating, stab fittings,butt heat fusions, tracer wire, and squeeze off. Quizzed employees on dig tickets, OQ, and equipment calibrations. An AOC was recognized and mitigated regarding underground facility clearances. All procedures were observed in compliance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 11-15-23 Brooks Reviewer: Date: IPUC Form 4 Rev. April 2023