HomeMy WebLinkAboutIntermountain Gas 231115 Middleton Construction IPUC Construction Inspection
Inspector(s): Galli Date(s): 11/15/2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: 722 & 815 Altia St, 1353 Saddle Peak City/District: Middleton
Ave, 1342 & 1354 Ha hook St
Contractor/Job #: Foreman: Employees: See job list
363-049658, 04855 KC Osmus
049662, 49684,05173
Job Description: %" Service Line Circle: Distribution
Operator Supervisor: Joe One-Call Ticket: 440789, 442734, 423669,
On-Site: N 442737, 442736
Total Inspection Days: 1
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi / 95 psi for 15 min
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pyrometer: 6/12/24
Pressure Gauge: 2/20/24
15. EFV Installation SAT OPS 301 EFV 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A I OPS 607
20. Line Locating SAT I OPS 611
1 P U C Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli observed Das-Co, a contractor for IGC install multiple 3/4" Service Lines in
Middleton, ID.
Address: 722 Altia St,Middleton, ID
Observations Include: correct trench depth, safety equipment, tracer wire, verification of equipment
calibrations, EFV 1200 installation, squeeze off procedures, bedding with sand and backfill. Quizzed
employees on AOCs of squeeze off procedures. All observed procedures were followed in accordance
with IGC Operations and Maintenance Manual.
Address: 815 Altia St,Middleton, ID
Observations Include: correct trench depth, safety equipment, tracer wire, verification of equipment
calibrations, EFV 1200 installation, successful pressure test, mechanical fittings, squeeze off
procedures, bedding with sand,backfill, continuity test and line located. All observed procedures were
followed in accordance with IGC Operations and Maintenance Manual.
Address: 1353 Saddle Peak Ave,Middleton, ID
Observations Include: correct trench depth, line locating, safety equipment, tracer wire,butt fusion,
EFV 1200 installation, verification of equipment calibrations, successful pressure test, squeeze off
procedures,bedding with sand and backfill. Quizzed employees on applicable AOCs of fusion
procedures. All observed procedures were followed in accordance with IGC Operations and
Maintenance Manual.
Address: 1342 & 1354 Hayhook St (Split Service), Middleton, ID
Observations Include: correct trench depth, line locating and safety equipment. All observed
procedures were followed in accordance with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): 6 �� Date: 11/15/2023
Galli
Reviewer: /
Date:
Brooks
IPUC Form 4 Rev. April 2023