Loading...
HomeMy WebLinkAboutIntermountain Gas 231115 Middleton Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 11/15/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 722 & 815 Altia St, 1353 Saddle Peak City/District: Middleton Ave, 1342 & 1354 Ha hook St Contractor/Job #: Foreman: Employees: See job list 363-049658, 04855 KC Osmus 049662, 49684,05173 Job Description: %" Service Line Circle: Distribution Operator Supervisor: Joe One-Call Ticket: 440789, 442734, 423669, On-Site: N 442737, 442736 Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi / 95 psi for 15 min 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer: 6/12/24 Pressure Gauge: 2/20/24 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I OPS 607 20. Line Locating SAT I OPS 611 1 P U C Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co, a contractor for IGC install multiple 3/4" Service Lines in Middleton, ID. Address: 722 Altia St,Middleton, ID Observations Include: correct trench depth, safety equipment, tracer wire, verification of equipment calibrations, EFV 1200 installation, squeeze off procedures, bedding with sand and backfill. Quizzed employees on AOCs of squeeze off procedures. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Address: 815 Altia St,Middleton, ID Observations Include: correct trench depth, safety equipment, tracer wire, verification of equipment calibrations, EFV 1200 installation, successful pressure test, mechanical fittings, squeeze off procedures, bedding with sand,backfill, continuity test and line located. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Address: 1353 Saddle Peak Ave,Middleton, ID Observations Include: correct trench depth, line locating, safety equipment, tracer wire,butt fusion, EFV 1200 installation, verification of equipment calibrations, successful pressure test, squeeze off procedures,bedding with sand and backfill. Quizzed employees on applicable AOCs of fusion procedures. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Address: 1342 & 1354 Hayhook St (Split Service), Middleton, ID Observations Include: correct trench depth, line locating and safety equipment. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): 6 �� Date: 11/15/2023 Galli Reviewer: / Date: Brooks IPUC Form 4 Rev. April 2023