Loading...
HomeMy WebLinkAboutIntermountain Gas 231115 Meridian Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 11/15/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 2156 E Star Ln (shop) City/District: Meridian Contractor/Job #: Foreman: Employees: See job list 050706-413 Jesus Garcia Job Description: 3/4" Service Line install Circle: Distribution Operator Supervisor: One-Call Ticket 440932 On-Site: Y Jason Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping SAT OPS 600 Steel Auto Perf 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pies in file 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 1 P U C Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe SAT OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co a contractor for IGC install a V service in Meridan, Idaho. To addresse(s):2156 E Star Ln (shop). Observations included: Safety equipment, trenching, thumper bore, line-locating, tracer wire install, bedding, welding on auto-perf, backfilling, and fusing. Quizzed fuser on squeeze/release times and inspection of pipe ends after heating. All procedures were observed in compliance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 11/15/2023 Perkins C e/x-''' _. Reviewer: Date: U� 16 -�3 Brooksff IPUC Form 4 Rev. April 2023