HomeMy WebLinkAboutIntermountain Gas 231115 Meridian Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 11/15/2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC)
Address: 2156 E Star Ln (shop) City/District: Meridian
Contractor/Job #: Foreman: Employees: See job list
050706-413 Jesus Garcia
Job Description: 3/4" Service Line install Circle: Distribution
Operator Supervisor: One-Call Ticket 440932
On-Site: Y Jason
Total Inspection Days: 1
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping SAT OPS 600 Steel Auto Perf
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pies in file
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
1 P U C Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe SAT OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co a contractor for IGC install a V service in Meridan, Idaho.
To addresse(s):2156 E Star Ln (shop). Observations included: Safety equipment, trenching, thumper
bore, line-locating, tracer wire install, bedding, welding on auto-perf, backfilling, and fusing.
Quizzed fuser on squeeze/release times and inspection of pipe ends after heating. All procedures were
observed in compliance with IGCs Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date: 11/15/2023
Perkins C e/x-''' _.
Reviewer:
Date: U� 16 -�3
Brooksff