HomeMy WebLinkAboutIntermountain Gas 231108 Meridian Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 11/8/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC Address: 4703 W Fern Vista Court City/District: Meridian Contractor/Job #: Foreman: Employees: See job list 413-47144 Librado Ruiz Job Description: 1/4" Service Line Circle: Distribution Operator Supervisor: Mingo One-Call Ticket: 413320 On-Site: Y Total Inspection Days: .5 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 Tested at 92 for 15 min 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer: 8/7/24 Pressure Gauge: 10/9/24 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe N/A OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co, a contractor for IGC install a 1/4' service line in Meridian, ID. Address: 4703 W Fern Vista Ct, Meridian, ID Observations Include: proper trench depth, safety equipment, tracer wire, verification of equipment calibrations, EFV 1200 installation, successful pressure tests, mechanical stab fittings, squeeze off, bedding with sand and backfill. Quizzed employees on AOCs of squeeze off procedures. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): "��� �' Date: 11/08/2023 Galli - Reviewer: Date: Brooks IPUC Form 4 Rev. April 2023