HomeMy WebLinkAboutIntermountain Gas 231106-07 Garden City Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 11/6-7/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 9998 W State St City/District: Garden City Contractor/Job #: Foreman: Employees: See job list 117760-425 Ethan Call Job Description: Circle: Distribution Install 3/4" service line Operator Supervisor: One-Call Ticket: 433533 On-Site: N Total Inspection Days: 2 Tasks: Ratin2 Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition SAT OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping SAT OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer: In File 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandomnent N/A I OPS 607 20. Line Locating SAT I I OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe SAT OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC install a 3/' service line at 9998 W State St in Garden City, ID. Observations Include: trenching, safety equipment, tracer wire, verification of equipment calibrations, EFV install, butt fusion, mechanical stab fittings, welding on tapping tee, bedding with sand and backfill. Quizzed employees on AOCs of fusion. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 11/7/23 Perkins Reviewer:Brooks l�� , ~� Date: ) s�" 1PUC Form 4 Rev. April 2023