HomeMy WebLinkAboutIntermountain Gas 231030 Nampa Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 10/30/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 41210t'Ave N (Trailer 6 & 8) City/District: Nampa Contractor/Job #: Foreman: Employees: See job list 371-051981 Ethan Call Job Description: Install % Service Line Circle: Distribution Operator Supervisor: John One-Call Ticket: 410490 On-Site: Y Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 minutes 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer: 7/6/24 Pressure Gauge: 4/11/24 15. EFV Installation N/A OPS 301 Existing EFV—Branch 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 1PUC Form 4 Rev. April 2023 I PUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co, a contractor for Intermountain Gas Company install a 3/ service line from an existing service. Address: 412 1 Wh Ave N,Nampa, ID Observation Include: line locating, trenching, safety equipment, tracer wire, butt fusion,pressure test at 96 psi for 15 minutes and bedding. Das-co employees were quizzed on applicable ADCs of fusion procedures. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Galli _____.., Date: 10/30/2023 Reviewer: Brooks Date: v - IPUC Form 4 Rev. April 2023