HomeMy WebLinkAboutIntermountain Gas 231025.2 Eagle Construction I PUC Construction Inspection Inspector(s): Galli Date(s): 10/25/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company GC Address: 1340 N Truman Ave City/District: Eagle 7742 W Palamas Dr Contractor/Job #: Foreman: Employees: See job list 417-016577, 417-16595 Darcy Ugalde Job Description: 1/411 Service Line Circle: Distribution Operator Supervisor: Kyle One-Call Ticket: 410312, 410282 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 94 psi for 15 min 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer: 6/5/24 Pressure Gauge: 12/1/23 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I OPS 607 20. Line Locating SAT I OPS 611 I P U C Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co a contractor for IGC install 1/4" service lines. Address: 1340 N Truman Ave, Eagle, ID Observations included: safety equipment, tracer wire,butt fusion, EFV 1200 installation, successful pressure test at 94 psi for 15 minutes, squeeze off, bedding and backfill. Quizzed employees on applicable AOCs of fusion and squeeze off procedures. All observed activity was completed in accordance with IGC Operations and Maintenance Manual. Address: 7742 W Palamas Dr, Eagle, ID Observations included: trenching, line locating, tracer wire, safety equipment, protection from weather (canopy),butt fusion and EFV 1200 installation. All observed activity was completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): o Galli T- Y` Date: 10/25/2023 Reviewer: Date: /0130- 13 Brooks IPUC Form 4 Rev. April 2023