Loading...
HomeMy WebLinkAboutIntermountain Gas 231023 Boise Construction IPUC Construction Inspection Inspector(s): Brooks Date(s): 10/23/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC Address: 12555/12543 W Arabian Dr City/District: Boise Contractor/Job #: Foreman: Employees: Barrett Lobdell 112978-425, 117752-425 Kobi Voyson Job Description: 1/4" Service Line installs Circle: Distribution Operator Supervisor: One-Call Ticket: 422611, 422613 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 Not Witnessed 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Calibration date pics in file 15. EFV Installation SAT OPS 301 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I OPS 607 20. Line Locating SAT I OPS 611 1PUC Form 4 Rev. April 2023 I PUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Brooks observed Das-Co, a contractor for IGC install 3/4" services at 12543 and 12555 W Arabian Dr in Boise, Idaho. Observations included; Safety equipment, trenching, bedding,backfilling, line-locating, fusing, tracer-wire, 1200 EFV install. Quizzed employees on dig tickets and equipment calibration. All procedures were observed in compliance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 10/23/23 Brooks Reviewer: Date: IPUC Form 4 Rev. April 2023