HomeMy WebLinkAboutIntermountain Gas 231018 Sugar City Construction IPUC Construction Inspection Inspector(s): Galli, Perkins Date(s): 10/18/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: City/District: Sugar City Sugar Mill Subdivision Contractor/Job #: Foreman: Employees: See job list 775-0162 Steve and Brandon Job Description: 2" Main Line Install Circle: Distribution Operator Supervisor: IGC FOC Justin One-Call Ticket: 411408, 411437, 411464, 411520 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer: exp 12/13/23 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I OPS 607 20. Line Locating N/A I OPS 611 IPUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli and Perkins observed KV a contractor for IGC install 2"main lines. To address: North 7 b East(Sugar Mill Subdivision), Sugar City, ID Observations included: Verification of OQs, correct trench depth, visual inspection of completed fused welds, observed fusion of a 2" T and end cap, tracer wire installation and bedding. Quizzed employees on applicable AOCs of fusion and bedding procedures. All observed activity was completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): -� Date: 10/18/2023 Galli Reviewer: Date: 10/19/2023 Brooks IPUC Form 4 Rev. April 2023