Loading...
HomeMy WebLinkAboutIntermountain Gas 231017 American Falls Construction IPUC Construction Inspection Inspector(s): Galli, Perkins Date(s): 10/17/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: City/District: American Falls 2975 S Lamb Weston Road Contractor/Job #: Foreman: Employees: See job list 667-0331 Daurel Palmer Job Description: 4" Steel Service Line Install Circle: Distribution Operator Supervisor: IGC FOC Justin One-Call Ticket: 411544 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation (Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification UNSAT OPS 501 Touch pyrometer expired 01/13/2023 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe N/A OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe SAT OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli and Perkins observed KV a contractor for IGC install approx. 1300' of 4" steel service line. To address: 3151 Witnah Road, American Falls, ID Date: 10/17/2023 Observations included: Correct trench depth, OQ verification, pre-heating of steel pipe and welding of 15 sticks of 4" steel pipe. Inspector Perkins discovered a touch pyrometer that has been expired since 1/13/2023. NOPV I202309 will be written. Inspector Perkins requested KV to verify with a second valid unexpired touch pyrometer that the expired touch pyrometer was reading similar temperatures to determine if the welds can be considered valid welds per the applicable welding procedure. Corrective Action Required: 1202309 NOPV Yes X No Follow-up Required: By Date: December 2, 2023 Yes X No Inspector (Lead): Date: 10/19/2023 Galli Reviewer: Date: f p - Brooks IPUC Form 4 Rev. April 2023