HomeMy WebLinkAboutIntermountain Gas 230912 Nampa Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 09/12/2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: 232 Elmore Ave City/District: Nampa
Contractor/Job #: Foreman: Employees: See job list and OQ's in file
051744-371 Ethan Call
Job Description: 1/4" Service Line install Circle: Distribution
Operator Supervisor: One-Call Ticket: 361262
On-Site: N
Total Inspection Days: 1
Tasks: Rating Critical Procedure # Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition SAT OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 PSI for 15 Minutes
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping SAT OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Calibration date pics in
file
15. EFV Installation SAT OPS 301 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
1PUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe SAT OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co a contractor for IGC install 1/4" services in Nampa, Idaho.
To address: 232 Elmore Ave. Observations included: Welding, hot Tapping, coating removal,
wrapping, safety equipment, trenching, bedding, backfilling, line-locating, fusing, stab fittings,
tracer-wire, 1200 EFV install,pressure testing and purging. Quizzed employees on purging and
cooling times after fusing.
Not all procedures were observed in compliance with IGCs Operations and Maintenance Manual.
Upon arriving at the job site, I observed a crew saw cutting the asphalt and they did not have the
required PPE on. After talking with the foreman, it was discovered that the JSA had not been
completed prior to work starting. I stopped all work and contacted Das-Co leadership and informed
them of the observed situation. Das-Co safety personnel arrived on-site and took control of the job.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date: 09/12/2023
Perkins
Reviewer:
Date:q./3.a3
Brooks
IPUC Form 4 Rev. April 2023