HomeMy WebLinkAboutIntermountain Gas 230912 Nampa Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 09/12/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 232 Elmore Ave City/District: Nampa Contractor/Job #: Foreman: Employees: See job list and OQ's in file 051744-371 Ethan Call Job Description: 1/4" Service Line install Circle: Distribution Operator Supervisor: One-Call Ticket: 361262 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition SAT OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 PSI for 15 Minutes 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping SAT OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Calibration date pics in file 15. EFV Installation SAT OPS 301 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe SAT OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co a contractor for IGC install 1/4" services in Nampa, Idaho. To address: 232 Elmore Ave. Observations included: Welding, hot Tapping, coating removal, wrapping, safety equipment, trenching, bedding, backfilling, line-locating, fusing, stab fittings, tracer-wire, 1200 EFV install,pressure testing and purging. Quizzed employees on purging and cooling times after fusing. Not all procedures were observed in compliance with IGCs Operations and Maintenance Manual. Upon arriving at the job site, I observed a crew saw cutting the asphalt and they did not have the required PPE on. After talking with the foreman, it was discovered that the JSA had not been completed prior to work starting. I stopped all work and contacted Das-Co leadership and informed them of the observed situation. Das-Co safety personnel arrived on-site and took control of the job. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 09/12/2023 Perkins Reviewer: Date:q./3.a3 Brooks IPUC Form 4 Rev. April 2023